We – EPG Team the greatest gearbox & motors , couplings and gears manufacturing facility in China with 5 various branches. For far more information: Cellular/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778083988828
Primary Elements Model :
No. | Portion Title | Model | ||
1 | Gear Reducers | Dinamic/ Bonfiglioli | ||
two | PLC system controller | MITSUBISHI,Japan | ||
three | Touch Monitor | MITSUBISHI,Japan | ||
four | Steering Solenoid valve | BMEG,Germany | ||
5 | Hydraulic valve | BMEG,Germany | ||
6 | Main Electrical factors | Schneider | ||
seven | Pressure oil pump | ZheJiang shenfu | ||
8 | Electric motor | Siemens | ||
nine | Main axle substance | 42CrMo | ||
10 | Alloy cutter substance | Tungsten carbide YG11 | ||
eleven | Shell materials | Q235 |
Major Technological Specification | |||||||||
No. | Product | OD*L | Primary Electrical power | Rectify technique Oil cylinder thrust | Maximum torque of Cutting Head (KN.M) | Rpm of Reducing Head (r/min) | Oil cylinder thrust of Major Equipment | Stress of oil cylinder(Mpa) | Discharge Pipe Dimensions (mm) |
1 | JR500 | Φ695*2950 | 22*1 | 220KN*four | fifteen.three | 13.seven | 200T*2 | 31.five | Φ75 |
2 | JR600 | Φ795*2840 | 22*one | 310KN*four | fifteen.three | 13.7 | 200T*2 | 31.five | Φ75 |
three | JR800 | Φ980*4400 | thirty*one | 550KN*five | 57 | 5 | 200T*2 | 31.five | Φ100 |
4 | JR1000 | Φ1220*4400 | fifteen*3 | 480KN*four | 89 | three.2 | 200T*two | 31.5 | Φ100 |
5 | JR1200 | Φ1460*3800 | eighteen.5*3 | 630KN*4 | 177 | 2.seven | 200T*2 | 31.5 | Φ100 |
/22*three | |||||||||
six | JR1350 | Φ1640*4500 | 22*three | 630KN*four | 177 | 2.seven | 200T*2 | 31.5 | Φ125 |
7 | JR1500 | Φ1820*5000 | 30*3 | 630KN*four | 276 | 2.7 | 200T*two | 31.5 | Φ125 |
/1600 | /Φ2000*5000 | ||||||||
8 | JR1800 | Φ2180*5000 | 30*4 | 800KN*8 | 415 | 2.five | 200T*four | 31.five | Φ125 |
/2000 | /Φ2420*5000 | 200T*6 | |||||||
nine | JR2200 | Φ2660*5200 | 37*4 | 800KN*eight | 553 | two.5 | 200T*6 | 31.five | Φ150 |
ten | JR2400 | Φ2900*5600 | thirty*6 | 990KN*8 | 553 | two.5 | 200T*6 | 31.five | Φ150 |
11 | JR2600 | Φ3160*5850 | 37*six | 990KN*8 | 837 | 2.five | 200T*8 | 31.five | Φ150 |
/2800 | /Φ3350*5850 | ||||||||
twelve | JR3000 | Φ3580*5900 | 37*8 | 1240KN*eight | 1719 | 2.5 | 200T*8 | 31.five | Φ150 |
Inside Structure :
Crushing Head Details :
Principal Axis and Gear Reducers Details :
Electrical Cupboard Particulars :
Engineering Case :
Merchandise Description :
Pipe Jac ept Device 2000mm created for large pipe jac ept engineering , generally utilized in the design of cement pipe crossings, building properties translation, sewers, roads and rivers as a sheathing of other tasks throughout a variety of channels.
Theory :
Pipe jac ept development is in the function in the pit ,by implies of jac ept Device which make jac ept drive, and conquer the friction amongst the pipes and the surrounding soil.
Jac ept the pipes Into the soil at the design and style slope.and Taken out soils .
After a section of pipe complete jac ept into the soil , then the next section of the pipes keep on to jack into the soil , The theory is by signifies of the thrust of the major cylinder pipeline, intermediate jac ept station,and other thrust pushing the device pipe or heading equipment (via the soil )from wor ept well to the receiving nicely and Raise up. Then , embed the pipes in between the two wells.
Main Features:
Complete Segment rock earth stress exhibit method.
The divided solitary grouting method for cutter panel and spindle center.
The rear of jac ept pipe device outfitted with jac ept unit and avert deviation device.
Disk cutter adopts renowned China brand.
Planetary gearbox adopts Italian BREVINI.
Undertake contact monitor, PLC Inverter and other sophisticated handle technique.
The data displayed on the contact screen can be related to users office keep an eye on via RS232 interface.
Advantage :
The edge of this method is no excavation on the floor,Do not demolition,Does not demolish the ground buildingsDon’t harm the environment,Does not impact pipeline section deformation,Time-conserving, successful, safe, reduced all round price.
The technologies are widely utilised in urban underground drinking water supply and drainage pipeline,Natural gasoline pipeline,Interaction cable and other non excavation laying.It can by means of the highway, railway, bridge, mountains, rivers, channel and any developing on the ground.The use of the technology development, can preserve a large amount of land acquisition and demolition costs,also can lessen environmental air pollution and street congestion,It has considerable economic and social benefits.
Wor ept Frequency :
one.Making use of in ROCK condition
two.Commonly employed in Southeast Asian nations, ZheJiang , and Japan.
3.Within cement pipe dia from 1000-3200 mm
four.Specialist manufacturer who can create ROCK pipe jac ept device in China.
Packaging & Shipping :
Nude Packing
Shipping and delivery Depth:
60 times following thirty% deposit obtaining
Our Solutions :
We will deliver professional technician to your venture website to operate the pipe jac ept device and teach operators for the venture,
1.On site service help
two. 12month guarantee
3.Existence time service assistance,
4. 7 days*24hours Very hot-line & Email Service.
five.Your inquiry related to our pipe jac ept device will be replied within 24 hours.Properly-skilled and knowledgeable workers will reply all your queries in fluent English.
Guarantee :
If quality & assembling problem induced difficulties, we get accountable on spare areas and all service costs.
If misuse or human factors induced the difficulties, consumers shall just take responsible on spare parts and all provider fees.
Chinese Patent of Compund Pipe Jac ept Device
one.Introduction to Equipment Efficiency
A.The entire machine is waterproof (Chinese patent amount ZL201822154528.).
B.By taking away the crushing wheel and the attachment of cutter head , this machine can be remoulded to the panel device which is more efficient for silty clay layer design and the device can be remoulded in the construction site.(add-ons included)
C.There is no require to return to the factory.By replacing the rock cutter head on the site and connecting the entrance monitor, the rock device needed for pure rock geology can be fashioned (sold separately).
D.In accordance to several many years of construction encounter, we combined with actual wor ept problems.We developed digital integrated control system independently, that can management the pump and valve team parts integratedly throughout the whole construction method.Also, the complete approach of construction can be convenient, easy, safe and trustworthy.
2. Geological problems applicable to manufacturing facility equipment (patent application variety 201915715.4)
A.It is suitable for pebble layer, sand pebble layer, soil pebble layer with particle measurement <= 30% of its own pipe diameter.
B.Miscellaneous filling layer (no steel bar, huge sum of non-degradable delicate domestic rubbish), basic filling layer
C.Ideal for all varieties of hard non-strongly cohesive soil levels with uniaxial compressive energy <= 10MPa
D.Blended with soil enhancement media to adapt to various sand layers
three.Specific Design and style
Electrical power technique of the gear , correction system of the pumping station, bypass program, pressure monitoring technique and handle system can all be developed for intercommunication of adjacent pipe diameters.Instance:Ø800 and Ø1000 can be shared
The Variation of Reducing Head of Compound Pipe Jac ept Machine
Undertaking Case :
Delivery info and provider after offer :
one)PAYMENT Conditions: |
T/T :30% as ept payment and T/T 70% paid out ahead of shipment |
2) DELIVERY : |
thirty days right after receipt of thirty% ept payment |
3 )Provider Following Market: |
Power box, motor, reducer box guarantee time period is one year, throughout this one 12 months support , non-human or unnatural disasters which led to any issues, we offer cost-free maintenance service to buyer’s Building Site. |
Hydraulic method, electrical method warranty interval is 6 months, Such as human variables lead to any problems and require to substitute with new 1, we will offer the Hydraulic and electrical parts at our value cost , buyer will bear the expense of Hydraulic and electrical areas and International convey expenses. |
Right after the equipment arrived at your Construction site, we will ship 2 machine operators whose wage is USD200/day, kindly also give our individuals ‘s space and foods and round excursion air tickets during the interval of design. |
The use of first tools manufacturer’s (OEM) component quantities or logos , e.g. CASE® and John Deere® are for reference needs only and for indicating item use and compatibility. Our firm and the listed substitute components contained herein are not sponsored, authorized, or produced by the OEM.